Proposed 2012 Projects

 

LOCATION PROPOSED CONSTRUCTION START

COMMENTS

Ganson - Wisner to Jackson (STP) Reconstruct/Resurf, Watermain Early Spring Reconstruction between West Ave and Steward Ave in the spring.  Resurfacing of the rest of the project will be done during the summer
West Ave: Wildwood to Ganson (MDOT Bridge) Bridge, St Reconst, Watermain, San Sewer Spring MDOT Project
Douglas Ct. Sanitary & Storm Sewer Spring  
Third - High to McNeal Sewer Separation Spring Sewer construction at mid-block only 
Durand - south end to Morrell St. Reconst, Watermain Spring To be completed in August before school begins.
InterCity Trail - Prospect to Francis Repave Bike Path Spring Includes realignment of entrance to King Center.
Wildwood - Edward to Steward Watermain - Directional Drill Summer Directional drilling on the north side to minimize road excavtion and traffic disruption.
Hibbard - Wildwood to RR Sewer Separation, Watermain, Repave Summer Project will address storm water problems in area.
Forest - bend to Edgewood (CDBG) St. Reconst, Watermain Summer  
Homewild - Perrine to State Sanitary Sewer Summer  
Homewild - Ellery to Edgewood (CDBG) St. Reconst, Watermain Summer  
High - Cooper to Losey (STP) Mill & Resurface Fall Includes railroad crossing repairs.  Bike lanes will be added.